1. Depress the clutch, pull out the button of the high-pressure pump power take-off, and then slowly release the clutch. 2. First pull out the plug of the reel to make the reel at a reasonable working angle, then release the high-pressure pipe and install a high-pressure nozzle of appropriate pipe diameter, continue to discharge the pipe into the sewer, and then the high-pressure three-way valve opens to high pressure. Slowly increase the throttle until the desired dredging effect is achieved. After the job is completed, return the throttle in turn, open the high-pressure three-way valve to the return state, retract the pipe, remove the nozzle, return the reel, and step on the clutch to close the power take-off. 2. First pull out the plug of the reel to make the reel at a reasonable working angle, then release the high-pressure pipe and install a high-pressure nozzle of appropriate pipe diameter, continue to discharge the pipe into the sewer, and then the high-pressure three-way valve opens to high pressure. Slowly increase the throttle until the desired dredging effect is achieved. After the job is completed, return the throttle in turn, open the high-pressure three-way valve to the return state, retract the pipe, remove the nozzle, return the reel, and step on the clutch to close the power take-off.
Price: Negotiable Condition: New
Location: Jingdezhen, Jiangxi Location: All over the country
Contact: Manager Zhang [Merchant]
Mobile: 15072996170 (Attribution: Suizhou, Hubei)
Company: Hubei Zhonglian Special Purpose Vehicle Co., Ltd. Real-named
富氏二手 FS USED提醒您:1)交易时请核实对方资质,对于过大宣传或承诺需谨慎!
2)任何要求预付定金、汇款等方式均存在风险,谨防上当。